Final Report Roadway Pavement Grinding Noise Study
performed by diamond grinding the planejointed concrete pavement built in 1990. The general condition of the pavement is considered to be good with respect to ride quality, with IRI values in inches per mile of 100 northbound lane (NBL) and 93 southbound lane (SBL).